Meetings – 2013

  • 01/25/13 – Business Meeting

    STAFF REPORTS

    • Item 5A – Permit No. 18801, San Joaquin County (Staff Report and Attachments)
    • Item 7A – Cease and Desist Order 2009-29 – Mr. Jesse Robles (Staff Report)
    • Item 7B – Cease and Desist Order 2009-30 – Mr. Joe Phillips (Staff Report)
    • Item 7C – Petition for Reconsideration – Carol Miller, Enforcement Resolution 2012-05
    • Item 7D – Petition for Reconsideration – Russell Ensslin and Janine Ensslin, Enforcement Reso. 2012-03 (Staff Report)
    • Item 7E – Schedule for Central Valley Floodplain Evaluation and Delineation Program (Staff Report)

    CEQA REPORTS

    • Item 5A – 18801 Initial Study/Mitigated Negative Declaration
  • 02/22/13 – Business Meeting

    STAFF REPORTS

    • Item 7A – 15526-1 Staff Report and Attachments (Goose Club Farms North)
    • Item 7B – 18725 Staff Report and Attachments (Pacific Gas and Electric Company)
    • Item 7C – 18812 Staff Reports and Attachments (Southern California Edison)

    CEQA REPORTS

    • Item 7B – Permit 18725 Draft Environmental Impact Statement/Environmental Impact Report
    • Item 7B – Permit 18725 Final Environmental Impact Statement/Environmental Impact Report
    • Item 7B – Permit 18725 Mitigation Monitoring and Reporting Program, Statement of Overriding Considerations, Resolution 11-03-01, and Notice of Determination
    • Item 7C – Permit 18812 Draft Environmental Impact Statement/Environmental Impact Report, Final Environmental Impact Statement/Environmental Impact Report, Mitigation Monitoring, Reporting, and Compliance Program, Decision 10-07-043, and Overriding Considerations
  • 03/15/13 – Executive Committee Meeting
  • 03/22/13 – Business Meeting

    POWER POINT PRESENTATIONS

    • Item 5 – USACE Levee Inspection Results)
    • Item 7C – Folsom Dam and Modification Project
    • Item 7D – Methylmercury Control Study Workplan
    • Item 8A – Sutter Bypass 2D model (.pptx)
    • Item 8A – Sutter Bypass 2D model (.pdf)

    STAFF REPORTS

    • Item 6A – 9856-1 Report and Attachments (City of Red Bluff)
    • Item 6B – 17933-1 Staff Report and Attachments (Carter Family Trust)
    • Item 6C – 18763 Staff Reports and Attachments (Reclamation District 2035)
    • Item 6D – 18804 Staff Report and Attachments (Cindy Lashbrook)
    • Item 6E – 18809 Staff Report and Attachments (Caltrans)
    • Item 6F – 18810 Staff Report and Attachments (Caltrans)
    • Item 6G – 18813 Staff Report and Attachments (Pacific Gas & Electric)
    • Item 6H – 18814 Staff Report and Attachments (Pacific Gas & Electric)
    • Item 6I – 18815 Staff Report and Attachments (City of Bakersfield)
    • Item 6J – 18816 Staff Report and Attachments (Powerhouse Science Center)
    • Item 6K – Lower Cache Creek Feasibility Study
    • Item 7A – Reclamation District 1001 Letter of Intent (LOI)
    • Item 7B – Section 905(b) Request to U.S. Army Corps of Engineers-Cache Creek Settling Basin
    • Item 7C REVISED 3-20-2013 – Folsom Dam Modification Project – Approach Channel Final Supplemental EIS/EIR
    • Item 7C – Folsom Dam Modification Project – Approach Channel Final Supplemental EIS/EIR
    • Item 7D – Methylmercury Control Study Workplan
    • Item 7E – Senate Bill 753, An Act to Amend the Water Code Relating to Flood Protection
    • Item 7E REVISED 3-19-2013 – Senate Bill 753, An Act to Amend the Water Code Relating to Flood Protection
    • Item 7F – Outreach Plan Re: Senate Bill 753
    • Item 8A – Sutter Bypass 2D model (.pptx)
    • Item 8A – Sutter Bypass 2D model (.pdf)

    CEQA REPORTS

    • Item 6C – Permit 18763 – Initial Study/Mitigated Negative Declaration, Mitigation Measures, Notice of Determination, RD 2035 Resolution No. 2012-003
    • Item 6J – Permit 18816 – Initial Study/Mitigated negative Declaration, Notice of Determination, American River Flood Control District Agreement for Levee Maintenance
  • 03/22/13 – Business Meeting

    POWER POINT PRESENTATIONS

    • Item 5 – USACE Levee Inspection Results)
    • Item 7C – Folsom Dam and Modification Project
    • Item 7D – Methylmercury Control Study Workplan
    • Item 8A – Sutter Bypass 2D model (.pptx)
    • Item 8A – Sutter Bypass 2D model (.pdf)

    STAFF REPORTS

    • Item 6A – 9856-1 Report and Attachments (City of Red Bluff)
    • Item 6B – 17933-1 Staff Report and Attachments (Carter Family Trust)
    • Item 6C – 18763 Staff Reports and Attachments (Reclamation District 2035)
    • Item 6D – 18804 Staff Report and Attachments (Cindy Lashbrook)
    • Item 6E – 18809 Staff Report and Attachments (Caltrans)
    • Item 6F – 18810 Staff Report and Attachments (Caltrans)
    • Item 6G – 18813 Staff Report and Attachments (Pacific Gas & Electric)
    • Item 6H – 18814 Staff Report and Attachments (Pacific Gas & Electric)
    • Item 6I – 18815 Staff Report and Attachments (City of Bakersfield)
    • Item 6J – 18816 Staff Report and Attachments (Powerhouse Science Center)
    • Item 6K – Lower Cache Creek Feasibility Study
    • Item 7A – Reclamation District 1001 Letter of Intent (LOI)
    • Item 7B – Section 905(b) Request to U.S. Army Corps of Engineers-Cache Creek Settling Basin
    • Item 7C REVISED 3-20-2013 – Folsom Dam Modification Project – Approach Channel Final Supplemental EIS/EIR
    • Item 7C – Folsom Dam Modification Project – Approach Channel Final Supplemental EIS/EIR
    • Item 7D – Methylmercury Control Study Workplan
    • Item 7E – Senate Bill 753, An Act to Amend the Water Code Relating to Flood Protection
    • Item 7E REVISED 3-19-2013 – Senate Bill 753, An Act to Amend the Water Code Relating to Flood Protection
    • Item 7F – Outreach Plan Re: Senate Bill 753
    • Item 8A – Sutter Bypass 2D model (.pptx)
    • Item 8A – Sutter Bypass 2D model (.pdf)

    CEQA REPORTS

    • Item 6C – Permit 18763 – Initial Study/Mitigated Negative Declaration, Mitigation Measures, Notice of Determination, RD 2035 Resolution No. 2012-003
    • Item 6J – Permit 18816 – Initial Study/Mitigated negative Declaration, Notice of Determination, American River Flood Control District Agreement for Levee Maintenance
  • 05/24/13 – Business Meeting

    POWER POINT PRESENTATIONS

    • Item 4 – SBFCA Presentation on Encroachments
    • Item 7A – SBFCA18793-1 Presentation
    • Item 7A – USACE Levee Insepction Briefing
    • Item 8B – ChangeVenuePresentation

    STAFF REPORTS

    • Item 4A – 18817 Staff Report and Attachments (Stockton East Water District)
    • Item 4B – 18851 Staff Report and Attachments (City of West Sacramento)
    • Item 7A – Permit 18793-1, Feather River West Levee, Proj Area C (SBFCA)
    • Item 7A – Permit 18793-1, Staff Report Attachment N
    • Item 8A – Senate Bill 753 – Report to the Board
    • Item 8B – Change of Venue

    CEQA REPORTS

    • Item 4A – 18817 Initial Study/Mitigated Negative Declaration and Notice of Determination
    • Item 4B – 18851 Study/Mitigated Negative Declaration, City of West Sacramento Resolution, and Notice of Determination
    • Item 7A – 18793-1 Draft Environmental Impact Report/Statement
    • Item 7A – 18793-1 Final Environmental Impact Report/Statement
    • Item 7A – 18793-1 SBFCA Resolutions 2013-05, 2013-6, Statement of Overriding Considerations and Notice of Determinations
  • 06/11/13 – Executive Committee Meeting
  • 06/26/13 – Executive Committee Meeting
  • 10/11/13 – CANCELLED – San Joaquin River Restoration Project Site Visit starting at 10:00 a.m. in Dos Palos, CA.
  • 10/25/13 – Business Meeting

    POWER POINT PRESENTATIONS

    • Item 6 – USACE Levee Inspection Results Briefing
    • Item 7 – DWR FloodSAFE Initiative
    • Item 8 – Executive Officer’s Report
    • Item 8 – Enforcement Report
    • Item 9A – Permit No. 18845, Westervelt Ecological Services
    • Item 10A – American River Common Features General Re-evaluation Report Letter of Intent
    • Item 11A – Flood System Repair Project Briefing
    • Item 11B – Urban Level of Flood Protection Criteria Briefing

    STAFF REPORTS

    • Item 4A – Permit No. 18876, Lion Farms, LLC
    • Item 4B – Permit No. 18878, Tulare County; Public Works Department
    • Item 4C – Permit No. 18882, CA State Dept of Transportation (Caltrans)
    • Item 7 – Report of the Activities of the Department of Water Resources
    • Item 9A – Permit No. 18845, Westervelt Ecological Services
    • Item 10A – American River Common Features General Re-Evaluation Report Letter of Intent

    CEQA REPORTS

    • Item 4B – Initial Study/Mitigated Negative Declaration
    • Item 4C – Initial Study/Mitigated Negative Declaration
    • Item 9 – Initial Study/Mitigated Negative Declaration, Long Term Management Plan

    INFORMATIONAL BRIEFING SUMMARIES

    • Item 11A – Flood System Repair Project (FSRP)
    • Item 11B – Urban Level of Flood Protection Criteria (ULOP)
  • 12/20/13 – Business Meeting

    POWER POINT PRESENTATIONS

    • Item 6 – USACE Levee Inspection Results Briefing
    • Item 7 – Flood Season Preparedness Briefing – Part 1 – Suen
    • Item 7 – Flood Season Preparedness Briefing – Part 2 – Talanki
    • Item 7 – Flood Season Preparedness Briefing – Part 3 – Lerner
    • Item 9 – Report of the Executive Officer
    • Item 9 – Enforcement Report
    • Item 10A – Sacramento River West Bank Levee System Letter of Intent (SRWB LOI)
    • Item 13A – Star Bend Setback Levee Transfer of Operation and Maintenance Responsibilities to Levee District 1
    • Item 13B – American River Common Features
    • Item 13C – Knights Landing – Service Area 6 – Yolo Bypass West Levee System Letter of Intent (LOI)
    • Item 13D – Emergency Regulations Implementing Senate Bill 753

    STAFF REPORTS

    • Item 4A – Permit No. 15773-1, Jim Morris
    • Item 7 – Report of the Activities of the Department of Water Resources
    • Item 10A – Sacramento River West Bank Levee System Letter of Intent
    • Item 13A – Star Bend Setback Levee Transfer of O&M Responsibilities to Levee District 1
    • Item 13B – American River Common Features
    • Item 13C – Knights Landing – Service Area 6 – Yolo Bypass West Levee System Letter of Intent
    • Item 13D – Emergency Regulations Implementing Senate Bill 753)