Feds release Yuba River floodplain restoration plan

From the Marysville Appeal-Democrat: A draft feasibility report issued Friday by the U.S. Army Corps of Engineers outlines a proposal to reconnect the Yuba River to its floodplain, create rearing habitat for juvenile fish, create riparian habitat, and improve conditions for natural habitat growth. Improvements to approximately 178 acres of existing aquatic and riparian habitat along the lower Yuba River, between Englebright Dam and the confluence of the Yuba and Feather rivers in Yuba County, are being proposed. (more)

Button link to Webcast page Button link to Calendar page Button link to Report Button link to storm damage help Button link to storm damage help Button link to Fees

Congratulations!

Greg Harvey has been selected as the Board’s Plan Implementation and Compliance Branch Chief, effective July 1, 2019. Greg has over 18 years of experience in the engineering field and has been with the Board since 2017. Since that time, Greg has played an active role in the coordination with key agencies for the Central Valley Flood Protection Plan Update, managed multiple flood system improvement projects, and acted as PIC Branch Supervisor for nine months. Congratulations, Greg!