From U.S. Bureau of Reclamation – East Sand Slough side channel restoration consists of excavating two channel entrances and a new and improved channel network upstream of the Antelope Boulevard/ Highway 36 Bridge and extending downstream from the bridge. The work includes excavating material from five distinct features – the main entrance, high-flow entrance, main channel, secondary channel, split channel, and a downstream of bridge channel that provides rearing habitat for juvenile salmonids at different flow regimes on the Sacramento River. (more)