Loading Events

« All Events

  • This event has passed.

June 2016 Board Meeting

June 24, 2016 @ 9:00 am - 5:00 pm

This is the regularly scheduled June meeting of the Central Valley Flood Protection Board.

WEBCAST RECORDING

AGENDA

  • June 24, 2016 Board Meeting Agenda

AGENDA ITEM SUPPORTING MATERIAL

  • Item 6A – Permit No. 19073, Recology Yuba Sutter (Remy Gill, Engineer, Operations Branch, CVFPB)
  • Item 8A – American River Watershed Project, Natomas Basin, Project Partnership and Local Project Partnership Agreements (Dan Tibbits, U.S. Army Corps of Engineers; Reena Jawanda, Division of Flood Management, DWR; and Deb Biswas, CVFPB)
  • Item 8B – U.S. Army Corps of Engineers Non-Federal Levee Program, West Sacramento (Paige Caldwell, Chief, Readiness Section, Sacramento District Office, USACE)
  • Item 9A – Cooperative Land Management in the Sacramento River Watershed (Keith Swanson, Chief, Division of Flood Management, DWR)
  • Item 9B – 2016 Delta Levees Maintenance Subventions Program (Andrea Lobato and Sandi Maxwell, Delta Levees Program, Division of Flood Management, DWR)
  • Item 9C – Property Transfers for EIP Acquired Right-of-Way (Michael Sabbaghian, Flood Projects Office, Division of Flood Management, DWR)
  • Item 9D – 2017 Central Valley Flood Protection Plan Update (Michael Mierzwa, Chief, Flood Planning Office, Division of Flood Management, DWR)
  • Item 9E – Report of the Department of Water Resources
    • Addendum – Water Conditions during May
  • Item 10A – Permit No. 18793-4, Sutter Butte Flood Control Agency (SBFCA), Feather River West Levee Project, Laurel Avenue Repair Project (Nancy Moricz, CVFPB) 
    • Addendum – CEQA Findings for Permit No. 18793-4
  • Item 13A – Adopt Amended Board Policy Regarding Board Member Committee Assignments (Leslie Gallagher, Executive Officer, CVFPB)
  • Item 13B – Update on Conservation Strategy Advisory Committee Meetings (James Herota, CVFPB)
  • Item 13C – Report on Board Staff Approach to Central Valley Flood Protection Plan Update Review and Integration Teams (Nancy Moricz, CVFPB)
  • Item 14A – Update on the Board’s Administration
  • Item 14B – Update on the activities of the Operations Branch
  • Item 14C – Update on the activities of the Plan Implementation and Compliance Branch
  • Item 14D – Update on the activities of the Environmental Services and Land Management Branch

ADDITIONAL SUPPORTING ENVIRONMENTAL DOCUMENTS

  • Item 8A – SAFCADraft/Final Environmental Impact Report, SAFCA Resolution 2010-145, Statement of Overriding Considerations
  • Item 10A – Permit No. 18793-4 – Draft Environmental Impact Report, Final Environmental Impact Report, Sutter Butte Flood Control Agency Board of Directors Resolution, CEQA Findings, Statement of Overriding Considerations, Mitigation Monitoring and Reporting Plan, Notice of Determination, Draft Supplemental Environmental Impact Report
  • Item 10A – Permit No. 18793-4 – Draft and Final Supplemental Environmental Impact Report, SBFCA Resolutions 2016-03/2016-04, Findings and Statement of Overriding Considerations, and Notice of Determination

POWERPOINT PRESENTATIONS AND HANDOUTS

  • Item 8A – Introductory remarks – American River Watershed Project, Natomas Basin, Project Partnership and Local Project Partnership Agreements (Deb Biswas, CVFPB)
  • Item 8A – Presentation – American River Watershed Project, Natomas Basin, Project Partnership and Local Project Partnership Agreements (Reena Jawanda, Division of Flood Management, DWR)
  • Item 8B – Presentation – U.S. Army Corps of Engineers Non-Federal Levee Program, West Sacramento (Paige Caldwell, Chief, Readiness Section, Sacramento District Office, USACE)
  • Item 9A – Presentation – Cooperative Land Management in the Sacramento River Watershed (Keith Swanson, Chief, Division of Flood Management, DWR)
  • Item 9B – Presentation – 2016 Delta Levees Maintenance Subventions Program (Andrea Lobato and Sandi Maxwell, Delta Levees Program, Division of Flood Management, DWR)
  • Item 9C – Presentation – Property Transfers for EIP Acquired Right-of-Way (Michael Sabbaghian, Flood Projects Office, Division of Flood Management, DWR)
  • Item 9D – 2017 Central Valley Flood Protection Plan Update (Michael Mierzwa, Chief, Flood Planning Office, Division of Flood Management, DWR)
  • Item 10A – Presentation – Permit No. 18793-4, Sutter Butte Flood Control Agency (SBFCA), Feather River West Levee Project, Laurel Avenue Repair Project (Nancy Moricz, CVFPB)
  • Item 13C – Presentation – Report on Board Staff Approach to Central Valley Flood Protection Plan Update Review and Integration Teams (Nancy Moricz, CVFPB)

 

Details

Date:
June 24, 2016
Time:
9:00 am - 5:00 pm

Organizer

Amber Woertink
Phone
(916) 574-0675
Email
Amber.Woertink@water.ca.gov

Venue

Sacramento Historic City Hall Building, 2nd Floor Hearing Room
915 I Street
Sacramento, CA 95814 United States
+ Google Map
Phone
(916) 264-5011
View Venue Website